360: Our 7 week Haulout at Cardinal, VA

360: Our 7 week Haulout at Cardinal, VA

We just are wrapping up a 7 week haul out at Zimmerman Marine in Cardinal VA. After living on 360 for 1-1/2 years we had a list of projects, replace our ablative bottom paint with Coppercoat, put propspeed on our props, replace escape hatch windows, replace salon hatches, replace thru hulls, swap our aluminum cleats for stainless steel….and the list goes on.
Now 7 weeks later we are back in the water but still at the dock doing final checks and lots of cleaning. Next our plans are to explore Chesapeake Bay Area for the next several weeks and then back to Zimmerman to install new davits. Staying north of the Hurricane zone until November, 1 then Bahamas and Caribbean.

Sanding coppercoat was a huge job.

Sanding coppercoat was a huge job.

Louie sanding and sanding and sanding…

Louie sanding and sanding and sanding…

Deb putting on the ceramic barrier coat on the sail drives

Deb putting on the ceramic barrier coat on the sail drives

360 on the way back to the water

360 on the way back to the water

Kirby was stored in the shed for the 7 weeks, first time back in water.

Kirby was stored in the shed for the 7 weeks, first time back in water.

360 back in the water, at the dock.

360 back in the water, at the dock.

360 Back in the Water

360 Back in the Water

Volvo Penta Folding Prop’s Installation

Volvo Penta Folding Prop’s Installation